TCM Matola – Phase 3.0 – 6.0 Million Ton Per Annum Terminal System Project
The upgrading of existing conveyor systems, including the procurement of a new ship loader, stacker reclaimer, rail marshaling yard, thor telescopic stacker, control bunker room, including new roads and drainage, enabling the Terminal de Carvão da Matola, Mozambique to increase it’s terminal capacity to 6.0 million tons per annum.
Location
Terminal de Carvão da Matola, Mozambique
Completion Date
May 2012
TCM Matola – Phase 3.5 – 7.3 Million Ton Per Annum Terminal System Project
The key driver for the project was to implement a new wagon offloading station, new conveyors, pipe conveyor and railway shunting leg, enabling the Terminal de Carvão da Matola, Mozambique to increase it’s terminal capacity to receive by rail, discharge, stockpile and ship 7.3 million tons of coal and magnetite per annum.
Location
Terminal de Carvão da Matola, Mozambique
Completion Date
July 2013
TCM Matola – Phase 4.0 – Panamax and Post Panamax Terminal Upgrade
This project was undertaken to meet the client’s requirement that Panamax and Post Panamax sized vessels be loaded at the Terminal de Carvão da Matola, Berth No. 01. This was achieved by upgrading the existing Ship Loader No. 02, along with the refurbishment of Berth No. 01 and the dredging of the berth pocket at Berth No. 01.
Location
Terminal de Carvão da Matola, Mozambique
Completion Date
July 2018
Maputo Car Terminal
The undertaking of a new vehicular parking, constructed through the implementing of specialised engineered earth stabilisation, along with the necessary bulk services, civil and external works as required.
Location
Maputo Harbour, Mozambique
Completion Date
September 2013