TCM Matola – Phase 4.0 – Panamax and Post Panamax Terminal Upgrade

This project was undertaken to meet the client’s requirement that Panamax and Post Panamax sized vessels be loaded at the Terminal de Carvão da Matola, Berth No. 01. This was achieved by upgrading the existing Ship Loader No. 02, along with the refurbishment of Berth No. 01 and the dredging of the berth pocket at Berth No. 01.

Contact Us

Location

Terminal de Carvão da Matola, Mozambique

Completion Date

July 2018